2011.5.20
Download
- gamma camera
(pictured on May 19th, 2011) - gamma camera control pannel
(pictured on May 19th, 2011)
2011.5.19
Download
The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
(pictured on May 18th, 2011)
2011.5.19
Download
Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
(pictured on March 11, 2011)
Place: North side of Radiation Waste Treatment Facility taken from 4th floor
2011.5.19
Download
Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
(pictured on March 11, 2011)
Place: The slope at the eastern side of Radioactive Solid Waste Storage Facility (The east side of Unit5 taken from the southern side of the unit)
Taken by: TEPCO's affiliate company
2011.5.18
Download
Departure of barge from Fukushima Daiichi Nuclear Power Station to Fukushima Daini Nuclear Power Station
- barge(front) and tagboat(back)
(pictured on May 18th, 2011)
2011.5.17
Download
- Fukushima Daiichi Nuclear Power Station Current status of restoration work(48.3MByte)
(video on May 6th, 2011)
(pictured on May 6th, 2011)
- Reactor buildings of Unit 1 and 2
- Truck with nitrogen supply equipment
- Car swept up by Tsunami
- Removal of rubble by an unmanned heavy machinery
- Crawler dump truck for spraying dust inhibitor
- Spraying dust inhibitor by a crawler dump truck
- Water spray to the spent fuel pool of Unit 4 by a concrete pumping vehicle
- Temporary substation for Unit 1 and 2
- Concrete placement to the vertical shaft of Unit 2 (1)
- Concrete placement to the vertical shaft of Unit 2 (2)
- Dust inhibitor sprayed around the circulating water pump of Unit 3
- Cable trench pit for the water intake of Unit 2
- Screen room of Unit 2
- Steel sheet piles at the water intake of Unit 2
- Silt fence installed around the water intake of Unit 2
- Temporary motor driven pump for water injection to the reactors of Unit1 to 3
- Heavy oil tank swept up by Tsunami
- Suppression pool's water surge-tank near Unit 5 and 6
- Ultrahigh voltage switching station of Unit 5 and 6
- Temporary tank installed near Unit 5 and 6 (1)
- Temporary tank installed near Unit 5 and 6 (2)
- Building for diesel generator 6B of Unit 6
- Rubble container
- Transfer of container
- Administration Office Building (exterior)
- Administration Office Building (interior 1)
- Administration Office Building (interior 2)
- 1st floor of the turbine building of Unit 1(1)
- 1st floor of the turbine building of Unit 1(2)
- Local exhauster installed in the turbine building of Unit 1
- Positive pressure room installed at the turbine building of Unit 1
- Entrance of Main Anti-Earthquake Building(A prefabricated house used for access control)
- Measurement of radioactivity in Main Anti-Earthquake Building
- Spare protective equipments(1)
- Spare protective equipments(2)
- Entrance of Main Anti-Earthquake Building(from inside)
- Emergency headquarters
- Water supply area of Main Anti-Earthquake Building
- Passing forward daily commodities in Main Anti-Earthquake Building
- Encouraging messages posted on the walls of Main Anti-Earthquake Building
2011.5.15
Download
Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
- Mega Float (at approximately 5:20 am)
(pictured on May 15th, 2011) - Mega Float, in the offing (1) (from approximately 5:20 am to approximately 5:50 am)
(pictured on May 15th, 2011) - Mega Float, in the offing (2) (from approximately 5:20 am to approximately 5:50 am)
(pictured on May 15th, 2011)
2011.5.14
Download
Carrying Work for New Cooling System (Air-cooled) for Residual Heat Removal System in Fukushima Daiichi Nuclear Power Station
(pictured on May 13th,2011)
2011.5.14
Download
The implementation status of Emergency Response Training at Fukushima Daini Nuclear Power Station
Please refer to "[Reference] Emergency Response Training at Fukushima Daini Nuclear Power Station" for the explanation of each picture.
- Emergency Response Room 1
(pictured on May 13th, 2011) - Emergency Response Room 2
(pictured on May 13th, 2011) - Deploying a power-supply car to the reactor building (Unit 1)
(pictured on May 13th, 2011) - Connecting power cables (Unit 1)
(pictured on May 13th, 2011) - Pouring the water into a temporary pool in the reactor building (Unit 4)
(pictured on May 13th, 2011) - Transporting the water to the reactor building using a fire engine (Unit 1)
(pictured on May 13th, 2011) - Installing a back up nitrogen gas cylinder to drive valves (Unit 3) 1
(pictured on May 13th, 2011) - Installing a back up nitrogen gas cylinder to drive valves (Unit 3) 2
(pictured on May 13th, 2011) - Carrying out a mock generator (turbine building at Unit 4)
(pictured on May 13th, 2011) - Transporting to seawater condenser building at Unit 4
(pictured on May 13th, 2011)
2011.5.12
Download
2011.5.12
Download
2011.5.11
Download
2011.5.11
Download
- The situation of inflow to the pit near intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
(pictured on May 11th, 2011)
2011.5.10
Download
- Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station (30MByte)
(video on May 8th, 2011)
2011.5.10
Download
2011.5.9
Download
- Northwest side of the first floor, Fukushima Daiichi Nuclear Power Station Unit1
(pictured on May 9th, 2011) - North side of the second floor, Fukushima Daiichi Nuclear Power Station Unit1
(pictured on May 9th, 2011)
2011.5.8
2011.5.8
Download
Fukushima Daiichi Nuclear Power Station
Status of Improved Working Environment Inside of Reactor Building of Unit 1
- First Floor of Turbine Building of Unit 1
(video on May 6th, 2011)
No comments:
Post a Comment